



i had looked at this building last year after the 'real lecture' that was on it. i have posted a few details, the top three of the point seen in images in the post below and a beam and post joint which is a lot bigger than it looks in the photo. the top image shows a major structural beam just to the left on the people in the cherry picker, it also shows the purlins and a truss system. it also shows a few bolted connections as well. a lot of this structure will be covered up when the building is completed, and although i am planing to go see it when completed (some time next year) it was good to the structure that we don't always get a chance to see.
name of building:Melbourne Convention Centre
address: unkbown- next to the Melbourne Exhibition Centre-2 Clarendon Street Southbank Victoria 3006 architect: NH architect with Woods Bagot
builder: Multiplex
date built: under construction (due for completion in 2009)
No comments:
Post a Comment